In the Vinony graph
Vinony's link graph records 9 inbound references to Laúca Dam, and connects out to hydroelectricity, Francis turbine and Angola.
The entry is geolocated on the map in landmark.
Vinony files it under 2020 establishments in Angola, Dams in Angola and Dams on the Cuanza River.
Vinony links it to 8 Wikipedia language editions.
Wikidata facts
- Instance of
- hydroelectric power station
- Country
- Angola
- Located in
- Malanje Province
- Elevation
- 850
- Body of water
- Cuanza River
- Image
- Barragem-Laúca-em-Malange-01.jpg
- Length
- 1100
Show 6 more facts
- located in/on physical feature
- Cuanza River
- inception
- 2012-00-00
- service entry
- 2017-07-01
- nominal power output
- 2070
- Commons category
- Laúca Dam
- date of official opening
- 2017-08-00
via Wikidata · CC0
On the map
Connections
hydroelectricity
Entity
Francis turbine
Entity
Angola
Country
Luanda
Entity
geographic coordinate system
Entity
dam
Entity
Google Maps
Entity
power station
Entity
José Eduardo dos Santos
Entity
Cuanza Norte Province
Entity
Malanje Province
Entity
Cuanza River
Entity
water turbine
Entity
Standard Chartered
Entity
hydraulic head
Entity
Capanda Dam
Entity
nameplate capacity
Entity
Federal Government of Brazil
Entity
roller-compacted concrete
Entity
Cambambe Hydroelectric Power Station
Entity