NordLink is a subsea 1,400 megawatt (MW) HVDC power cable between Norway and Germany, opened in May 2021. The long line operates at a voltage of 500 kV DC. It consists of 54 kilometres long land cable in Schleswig-Holstein, Germany, a 516 kilometres long submarine cable between Germany and Norway and a 53 kilometres long overhead line with 140 towers in Norway.

Key facts

Power transmission line.name
NORD.LINK
Power transmission line.map_caption
Location of NORD.LINK
Power transmission line.country
NorwayGermany
Power transmission line.start
Ertsmyra, Norway
Power transmission line.through
North Sea
Power transmission line.finish
Büsum shore and Wilster substation, Germany
Power transmission line.partners
StatnettTenneT TSO / KfW
Power transmission line.est
May 2021
Power transmission line.type
submarine cable, land cable, overhead line
Power transmission line.current_type
HVDC
Power transmission line.length_km
625
Power transmission line.capacity
1,400 MW
Power transmission line.DC_voltage
500 kV
Power transmission line.poles_no
2
Power transmission line.circuits_no
1

via Wikipedia infobox

~3 min read

Encyclopedic overview

8 sections
Contents
  • Construction
  • Operation
  • Ownership
  • Sites
  • Waypoints
  • See also
  • External links
  • References

NordLink is a subsea 1,400 megawatt (MW) HVDC power cable between Norway and Germany, opened in May 2021. The long line operates at a voltage of 500 kV DC. It consists of 54 kilometres long land cable in Schleswig-Holstein, Germany, a 516 kilometres long submarine cable between Germany and Norway and a 53 kilometres long overhead line with 140 towers in Norway.

==Construction== It is estimated to cost €1.5–2 billion, which was financed in 2015 when Statnett decided to realize the project. The interconnector was installed between a new substation at Ertsmyra (near Tonstad) in Norway and Wilster substation in Schleswig-Holstein in Germany. The connection was expected to be completed in 2020. When testing in September 2020, it accidentally imported the full 1,400 MW into Norway for almost a minute, causing cascading grid effects such as a 0.5 Hz frequency change across the Nordic synchronous area. The opening ceremony took place on 27 May 2021.