NorNed is a long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produce

Key facts

Power transmission line.name
NorNed
Power transmission line.map_caption
Location of NorNed
Power transmission line.country
Norway, Netherlands
Power transmission line.direction
north–south
Power transmission line.start
Feda, Norway
Power transmission line.through
North Sea
Power transmission line.finish
Eemshaven, Netherlands
Power transmission line.partners
Statnett, TenneT
Power transmission line.cable_manufacturer
Nexans, ABB
Power transmission line.construction
2006
Power transmission line.est
2008
Power transmission line.type
submarine cable
Power transmission line.current_type
HVDC
Power transmission line.length_km
580
Power transmission line.capacity
700 MW
Power transmission line.AC_voltage
300 kV (Feda), 400 kV (Eemshaven)
Power transmission line.DC_voltage
±450 kV
Power transmission line.poles_no
1

via Wikipedia infobox

Wikidata facts

Mass
45000
Length
580
Show 7 more facts
service entry
2008-05-06
inception
2007-00-00
throughput
700
service life
40
voltage
450000
frequency
0
Commons category
NorNed-kabel
Sources (1)

via Wikidata · CC0

~4 min read

Article

7 sections
Contents
  • History
  • Technology
  • Sites
  • Trading mechanism
  • See also
  • References
  • External links

NorNed is a long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produced by ABB.

== History == Installation of the first sections started in early 2006 and the final section was laid by the end of 2007. On the Dutch shore, TenneT has connected the cable to the 380 kV Dutch high‑voltage grid. In Feda, Statnett has done the same for the 300 kV Norwegian transmission grid. Commercial operation started on 5 May 2008 with a capacity auction. The first commercial power transfer took place on 6 May 2008.