Skip to content
STS-135

File:STS-135_landing_cropped.jpg · Wikimedia Commons · See Wikimedia Commons

EntityQ309080· pop 38· linked from 482 articles

STS-135 (ISS assembly flight ULF7) was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Stat

Key facts

Spaceflight.name
STS-135
Spaceflight.image
STS-135 landing cropped.jpg
Spaceflight.image_caption
Atlantis lands at the Kennedy Space Center on July 21, 2011, bringing the Shuttle program to an end.
Spaceflight.names_list
Space Transportation System-135
Spaceflight.mission_type
ISS logistics
Spaceflight.operator
NASA
Spaceflight.crew_size
4
Spaceflight.launch_date
UTC, 11:29:04amEDT
Spaceflight.launch_site
Kennedy, LC-39A
Spaceflight.landing_date
UTC, 5:57:54amEDT
Spaceflight.landing_site
Kennedy, SLF Runway 15
Spaceflight.orbit_reference
Geocentric orbit
Spaceflight.orbit_regime
Low Earth orbit
Spaceflight.orbit_inclination
51.6°
Spaceflight.orbit_period
91 minutes
Spaceflight.apsis
gee
Spaceflight.insignia
STS-135 Patch.svg
Spaceflight.crew_photo
STS-135 Official Crew Photo.jpg

via Wikipedia infobox

Wikidata facts

Duration
1103330
Mass
2050756
Image
STS-135 landing cropped.jpg
Show 9 more facts
Commons category
STS-135
UTC date of spacecraft launch
2011-07-08
Commons gallery
STS-135
orbital inclination
51.6
apoapsis
343
spacecraft docking/undocking date
2011-07-19
UTC date of spacecraft landing
2011-07-21
event distance
8505161
social media followers
73778
Sources (5)

via Wikidata · CC0

~66 min read

Article

41 sections
Contents
  • Crew
  • Crew seat assignments
  • Funding
  • Mission parameters
  • Payload
  • Multi-Purpose Logistics Module
  • Lightweight Multi-Purpose Carrier
  • Robotic Refueling Mission
  • Picosatellite Solar Cell Testbed 2
  • TriDAR
  • Down-mass payload
  • Other supplies
  • Shuttle processing
  • Visit by President Obama's family
  • Rollover
  • Rollout
  • External tank fueling test
  • Payload canister
  • Terminal countdown demonstration test
  • Launch attempts
  • Mission timeline
  • July 8 (Flight Day 1 – Launch)
  • July 9 (Flight Day 2 – TPS survey)
  • July 10 (Flight Day 3 – Docking)
  • July 11 (Flight Day 4 – MPLM installation)
  • July 12 (Flight Day 5 – Station spacewalk)
  • July 13 (Flight Day 6 – Cargo transfers)
  • July 14 (Flight Day 7 – Cargo transfers/Off-duty)
  • July 15 (Flight Day 8 – Cargo transfers)
  • July 16 (Flight Day 9 – Cargo transfers)
  • July 17 (Flight Day 10 – Cargo transfers/Off duty)
  • July 18 (Flight Day 11 – MPLM return, farewells/Hatch closure)
  • July 19 (Flight Day 12 – Undocking)
  • July 20 (Flight Day 13 – PicoSat deployment/Landing prep)
  • July 21 (Flight Day 14 – Landing)
  • Welcome home ceremonies
  • Wake-up calls
  • See also
  • Notes
  • References
  • External links

STS-135 (ISS assembly flight ULF7) was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

Although the mission was authorized, it initially had no appropriation in the NASA budget, raising questions about whether the mission would fly. On January 20, 2011, program managers changed STS-335 to STS-135 on the flight manifest. This allowed for training and other mission specific preparations. On February 13, 2011, program managers told their workforce that STS-135 would fly regardless of the funding situation via a continuing resolution. Until this point, there had been no official references to the STS-135 mission in NASA documentation for the general public.

Gallery (32)

Connections

Categories