Skip to content
Thames Barrier

Official website (https://www.gov.uk/guidance/the-thames-barrier)

EntityQ948363· pop 30· linked from 472 articles

Thames Barrier

Sign in to save

flood defence in London

Key facts

Country
United Kingdom
Location
London
Purpose
Flood control
Status
Operational
Construction began
1974 ; 52 years ago ( 1974 )
Opening date
8 May 1984 ; 42 years ago ( 1984-05-08 )
Construction cost
£535 million
Built by
Costain Hollandsche Beton Maatschappij Tarmac Construction Tysons, Liverpool Cleveland Bridge & Engineering
Operator
Environment Agency
Type of dam
Barrage
Impounds
River Thames
Height thalweg
20.1 metres
Length
520 metres

via Wikipedia infobox

Official website

The Thames Barrier - GOV.UK

How the Thames Barrier works, and when it is scheduled to close.

gov.uk

Link to the official site · 24,458 chars · not written by Vinony

~16 min read

Encyclopedic overview

Far view of the River Thames Flood Barrier

The Thames Barrier is a retractable barrier system built to protect the floodplain of most of Greater London from exceptionally high tides and storm surges moving up from the North Sea. It has been operational since 1982. When needed, it is closed (raised) during high tide; at low tide, it can be opened to restore the river's flow towards the sea. Built about 2 miles (3.2 kilometres) east of the Isle of Dogs, its northern bank is in Silvertown in the London Borough of Newham and its southern bank is in the New Charlton area of the Royal Borough of Greenwich.

Excerpted from Wikipedia’s “Thames Barrier” article, available under the CC BY-SA 4.0 licence.

On the map