Skip to content
EntityQ129200· pop 36· linked from 368 articles

Also known as Type 001 aircraft carrier, PLANS Liaoning, Chinese aircraft carrier Liaoning

1988 Kuznetsov-class aircraft carrier

Key facts

Builders
Dalian Shipbuilding Industry
Operators
People's Liberation Army Navy
Preceded by
Kiev class
Succeeded by
Type 002 Shandong
Name
Riga (1988) then Varyag (1990)
Namesake
City of Riga , Latvia (1988) then Varyag , named for the Varangians (1990), the name Varyag was then adopted by another cruiser .
Builder
Mykolaiv South Nevskoye Planning and Design Bureau
Laid down
6 December 1985
Launched
4 December 1988
Fate
Sold to a Chinese buyer, 1998 Transferred to the Chinese navy, 2002
Cost
US$ 120 Million (Former Ukraine)
Commissioned
25 September 2012
Motto
( Simplified Chinese :保卫祖国,勇争第一):Defend the motherland, strive to be the first.
Status
In active service
Badge
See § Ship Emblem
Class type
Type 001, Kuznetsov -class aircraft carrier
Type
STOBAR aircraft carrier
Displacement
43,000 tons, light 54,500 tons, normal 60,900 tons, full load

via Wikipedia infobox

Wikidata facts

Image
Aircraft Carrier Liaoning CV-16.jpg
Width
72
Length
306
Speed
29
Show 7 more facts
native label
辽宁号航空母舰
draft
10
pennant number
16
Commons category
PLANS Liaoning (CV-16)
beam
75
date of official opening
1988-12-04
name
Liaoning
Sources (5)

via Wikidata · CC0

~22 min read

Article

Liaoning (16; Chinese: 辽宁舰; pinyin: Liáoníng Jiàn) is a Chinese Type 001 aircraft carrier. The first aircraft carrier commissioned into the People's Liberation Army Navy Surface Force, she was originally classified as a training ship, intended to allow the Navy to experiment, train and gain familiarity with aircraft carrier operations. Following upgrades and additional training in late 2018, Chinese state media announced that the ship would shift to a combat role in 2019.

Originally laid down in 1985 for the Soviet Navy as the Kuznetsov-class aircraft carrier Riga, she was launched on 4 December 1988 and renamed Varyag in 1990. After the dissolution of the Soviet Union in 1991, construction was halted and the ship was put up for sale by Ukraine. The stripped hulk was purchased in 1998 and after much delay, towed to the Dalian naval shipyard in northeast China, arriving in 2002.

On the map

Connections

Categories