Skip to content
M-Bahn
EntityQ648121· pop 16· linked from 147 articles

The M-Bahn or Magnetbahn was an elevated Maglev train line operating in Berlin, Germany, experimentally from 1984 and in passenger operation from 1989 to 1991. The line was in length, and featured three stations, two of which were newly constructed. Presumed to be the future of rail transit in Berlin, the line was built to fill a gap in the West Berlin public transport network created by the construction of the Berlin Wall. It was rendered redundant by the reunification of Berlin and was closed to enable reconstruction of the U2 line.

Key facts

Rail line.name
Berlin M-Bahn
Rail line.color
e44f1a
Rail line.logo
M-Bahn symbol.svg
Rail line.logo_width
75px
Rail line.image
M-Bahn Museum Nürnberg.JPG
Rail line.caption
M-Bahn train 06 at the Nuremberg Transport Museum
Rail line.type
Maglev
Rail line.system
AEG Rail Systems
Rail line.status
dismantled
Rail line.locale
Berlin, West Germany
Rail line.start
Gleisdreieck
Rail line.end
Kemperplatz
Rail line.stations
3
Rail line.open
(testing) (service)
Rail line.close
(closed) (dismantled)
Rail line.owner
Magnetbahn GmbH
Rail line.character
Elevated metro
Rail line.stock
1× M70/26× M80/21× maintenance vehicle

via Wikipedia infobox

Wikidata facts

Image
1990 04 Berlin M Bahn 1.jpg
Length
1.6
Show 4 more facts
date of official closure
1991-00-00
Commons category
M-Bahn
sRGB color hex triplet
FFDE80
date of official opening
1984-00-00
Sources (2)

via Wikidata · CC0

~6 min read

Article

7 sections
Contents
  • History
  • Route
  • Rolling stock
  • Technology
  • In media
  • References
  • External links

The M-Bahn or Magnetbahn was an elevated Maglev train line operating in Berlin, Germany, experimentally from 1984 and in passenger operation from 1989 to 1991. The line was in length, and featured three stations, two of which were newly constructed. Presumed to be the future of rail transit in Berlin, the line was built to fill a gap in the West Berlin public transport network created by the construction of the Berlin Wall. It was rendered redundant by the reunification of Berlin and was closed to enable reconstruction of the U2 line.

The M-Bahn was the second Maglev line to open to public traffic, after the Birmingham Maglev but before the Shanghai maglev train. Construction and running were undertaken by Magnetbahn GmbH. thumb|1990 04 Berlin M Bahn 1

Gallery (4)

On the map

9 mapped locations

Connections

Categories