Phénix (French for phoenix) was a small-scale (gross 264/net 233 MWe) prototype fast breeder reactor, located at the Marcoule nuclear site, near Orange, France. It was a pool-type liquid-metal fast breeder reactor cooled with liquid sodium. It generated 590 MW of thermal power, and had a breeding ratio of 1.16 (16% more plutonium produced than consumed), but normally had to be stopped for refueling operations every two months. Phénix continued operating after the closure of the subsequent full-scale prototype Superphénix in 1997. After 2004, its main use was investigation of transmutation

Key facts

Power station.ps_electrical_cap_fac
27.0%
Power station.name
Phénix
Power station.country
France
Power station.location
Marcoule
Power station.status
Closed
Power station.construction_began
1968
Power station.operator
CEAEDF
Power station.ps_units_decommissioned
1 x 250 MW
Power station.np_reactor_type
FBR
Power station.np_reactor_supplier
CEM
Power station.ps_units_manu_model
CEM
Power station.ps_electrical_capacity
250
Power station.ps_annual_generation
591

via Wikipedia infobox

Wikidata facts

Image
CEA Marcoule Site.jpg
Show 6 more facts
service entry
1974-07-14
service retirement
2010-02-01
inception
1968-11-01
nominal power output
130
annual energy output
664
native label
Phénix
Sources (5)

via Wikidata · CC0

~4 min read

Article

3 sections
Contents
  • History
  • References
  • External links

Phénix (French for phoenix) was a small-scale (gross 264/net 233 MWe) prototype fast breeder reactor, located at the Marcoule nuclear site, near Orange, France. It was a pool-type liquid-metal fast breeder reactor cooled with liquid sodium. It generated 590 MW of thermal power, and had a breeding ratio of 1.16 (16% more plutonium produced than consumed), but normally had to be stopped for refueling operations every two months. Phénix continued operating after the closure of the subsequent full-scale prototype Superphénix in 1997. After 2004, its main use was investigation of transmutation of nuclear waste while also generating some electricity. Phénix was shut down in 2009.

The decommissioning project started in 2005. Between 2009 and 2011, the non-nuclear equipment and turbine hall were dismantled. The decommissioning license was expected for 2015. Finalising of the decommissioning process is expected between 2031 and 2043.