Skip to content
STS-27
EntityQ568763· pop 31· linked from 221 articles

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on December 2, 1988, on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense (DoD), ultimately determined to be a Lacrosse surveillance satellite. The vessel's heat shielding was substantially damaged during lift-off, and crew members thought that they would die during reentry. This was a situation that was similar to the one that would prove fatal 15 years la

Key facts

Spaceflight.name
STS-27
Spaceflight.names_list
Space Transportation System-27STS-27R
Spaceflight.image
Atlantis taking off on STS-27.jpg
Spaceflight.image_caption
Launch of Atlantis
Spaceflight.mission_type
DoD satellite deployment
Spaceflight.operator
NASA
Spaceflight.orbits_completed
68
Spaceflight.launch_mass
(Classified)
Spaceflight.crew_size
5
Spaceflight.launch_date
UTC (9:30:34amEST)
Spaceflight.launch_site
Kennedy, LC-39B
Spaceflight.launch_contractor
Rockwell International
Spaceflight.landing_date
UTC (3:36:11pmPDT)
Spaceflight.landing_site
Edwards, Runway17
Spaceflight.orbit_reference
Geocentric orbit
Spaceflight.orbit_regime
Low Earth orbit
Spaceflight.orbit_inclination
57.00°
Spaceflight.orbit_period
93.40 minutes

via Wikipedia infobox

Wikidata facts

Duration
378337
Mass
14500
Orbital period
93.4
Image
Atlantis taking off on STS-27.jpg
Show 8 more facts
Commons category
STS-27
UTC date of spacecraft launch
1988-12-02
orbits completed
68
UTC date of spacecraft landing
1988-12-06
Commons gallery
STS-27
orbital inclination
57.0
periapsis
437
apoapsis
447
Sources (3)

via Wikidata · CC0

~9 min read

Article

9 sections
Contents
  • Crew
  • Crew seat assignments
  • Mission summary
  • Tile damage
  • Wake-up calls
  • Gallery
  • See also
  • References
  • External links

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on December 2, 1988, on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense (DoD), ultimately determined to be a Lacrosse surveillance satellite. The vessel's heat shielding was substantially damaged during lift-off, and crew members thought that they would die during reentry. This was a situation that was similar to the one that would prove fatal 15 years later on STS-107. Compared to the damage that Columbia sustained on STS-107, Atlantis experienced more extensive damage. However, this was over less critical areas and the missing tile was over an antenna which gave extra protection to the spacecraft structure. The mission landed successfully, although intense heat damage needed to be repaired.

The mission is technically designated STS-27R, as the original STS-27 designator belonged to STS-51-I, the twentieth Space Shuttle mission. Official documentation for that mission contained the designator STS-27 throughout. As STS-51-L was designated STS-33, future flights with the STS-26 through STS-33 designators would require the R in their documentation to avoid conflicts in tracking data from one mission to another.

Gallery (8)

Connections

Categories