Skip to content
EntityQ20379· pop 36· linked from 842 articles

Toronto subway

Sign in to save

rapid transit system in Ontario, Canada

Key facts

Owner
Toronto Transit Commission (Lines 1, 2 and 4) Metrolinx (Lines 5 and 6)
Area served
Greater Toronto
Locale
Toronto , Ontario Vaughan , Ontario
Transit type
Rapid transit
Number of lines
5 (plus 1 under construction)
Number of stations
109 (plus 26 under construction)
Daily ridership
1,089,300 (weekdays, Q1 2026)
Annual ridership
331,789,000 (2025)
Began operation
March 30, 1954 ; 72 years ago ( 1954-03-30 )
Operator s
Toronto Transit Commission
Number of vehicles
830 heavy rail cars 66 work cars
Train length
6 cars (Lines 1 and 2) 4 cars (Line 4) 2 cars (Line 5) 1 car (Line 6)
Headway
2 min 30 s – 5 min (Line 1) 2 min 20 s – 6 min (Line 2) 5 min 30 s (Line 4) 4 min 4 s – 12 min 40 s (Line 5) 6 min 32 s – 12 min 15 s (Line 6)
System length
100.1 km (62.2 mi) , (33.2 km (20.6 mi) under construction)
Track gauge
1,495 mm ( 4 ft 10 + 7 ⁄ 8 in ) Toronto gauge (Lines 1, 2 and 4) 1,435 mm ( 4 ft 8 + 1 ⁄ 2 in ) standard gauge (Lines 5 and 6)
Electrification
Third rail , 600 V DC (Lines 1, 2 and 4) Overhead line , 750 V DC (Lines 5 and 6)

via Wikipedia infobox

Official website

Link to the official site · 24,768 chars · not written by Vinony

~40 min read

Encyclopedic overview

This diagram: view talk edit

Show route diagram

Excerpted from Wikipedia’s “Toronto subway” article, available under the CC BY-SA 4.0 licence.