Skip to content
EntityQ19816744· pop 29· linked from 708 articles

Also known as Vulcan rocket, Vulcan Centaur, Vulcan ACES, Next Generation Launch System, NGLS

United Launch Alliance launch vehicle

Key facts

Function
Heavy-lift launch vehicle
Manufacturer
United Launch Alliance
Country of origin
United States
Cost per launch
US$110 million (starting)
Height
With standard length payload fairing</span>"}]]}'>Standard : 61.6 m (202 ft), With long payload fairing</span>"}]]}'>Long : 67.3 m (221 ft)
Diameter
5.4 m (18 ft)
Mass
546,700 kg (1,205,300 lb)
Orbital inclination
28.7°
Status
Operational
Launch sites
Cape Canaveral , SLC ‑ 41 Vandenberg , SLC ‑ 3 (planned)
First flight
January 8, 2024
Last flight
February 12, 2026 (most recent)
No boosters
0, 2, 4, or 6
Empty mass
4,521 kg (9,966 lb)
Gross mass
53,030 kg (116,920 lb)
Propellant mass
47,853 kg (105,497 lb)
Maximum thrust
2,061 kN (463,249 lb f ) each
Total thrust
12,364 kN (2,779,494 lb f ) with 6

via Wikipedia infobox

Wikidata facts

Diameter
5.4
Mass
546700
Image
Vulcan Centaur rollout (Peregrine) (cropped 2).jpg
Height
61.6
Show 3 more facts
Commons category
Vulcan (rocket)
first flight
2024-01-08
native label
Vulcan Centaur
Sources (6)

via Wikidata · CC0

~20 min read

Article

Vulcan Centaur is a heavy-lift launch vehicle developed and operated by United Launch Alliance (ULA). It is a two-stage-to-orbit launch vehicle consisting of the Vulcan first stage and the Centaur V second stage. Replacing ULA's Atlas V and Delta IV rockets, the Vulcan Centaur is principally designed to meet the needs of the National Security Space Launch (NSSL) program, which supports U.S. intelligence agencies and the Defense Department, but ULA believes it will also be able to price missions low enough to attract commercial launches.

ULA began development of the new launch vehicle in 2014, primarily to compete with SpaceX’s Falcon 9 and to comply with a Congressional mandate to phase out the use of the Russian-made RD-180 engine that powered the Atlas V. The first launch of the Vulcan Centaur was initially scheduled for 2019 but faced multiple delays due to developmental challenges with its new BE-4 first-stage engine and the Centaur second-stage.

Connections

Categories