Skip to content
EntityQ754842· pop 32· linked from 1,149 articles

Shuttle–Mir program

Sign in to save

space program between Russia and the United States

Key facts

Country
Russia United States
Organization
PKA NASA
Status
Completed
First flight
February 3, 1994 ( STS-60 )
Last flight
June 2, 1998 ( STS-91 )
Launch sites
Kennedy Space Center Baikonur
Crewed vehicles
Space Shuttle Mir Soyuz

via Wikipedia infobox

Wikidata facts

Image
Atlantis-MIR-GPN-2000-001071.jpg
Show 3 more facts
Commons category
Shuttle–Mir program
start time
1993-00-00
end time
1998-00-00
Sources (1)

via Wikidata · CC0

~38 min read

Article

The Shuttle–Mir program (Russian: Программа «Мир»–«Шаттл») was a collaborative space program between Russia and the United States that involved American Space Shuttles visiting the Russian space station Mir, Russian cosmonauts flying on the Shuttle, and an American astronaut flying aboard a Soyuz spacecraft to allow American astronauts to engage in long-duration expeditions aboard Mir.

The project, sometimes called "Phase One", was intended to allow the United States to learn from Russian experience with long-duration spaceflight and to foster a spirit of cooperation between the two nations and their space agencies, the National Aeronautics and Space Administration (NASA) and the Russian Space Agency (RKA). The project helped to prepare the way for further cooperative space ventures; specifically, "Phase Two" of the joint project, the construction of the International Space Station (ISS). The program was announced in 1993, the first mission started in 1994 and the project continued until its scheduled completion in 1998. Eleven Space Shuttle missions, a joint Soyuz flight and almost 1,000 cumulative days in space for American astronauts occurred over the course of seven long-duration expeditions. In addition to Space Shuttle launches to Mir the United States also fully funded and equipped with scientific equipment the Spektr module (launched in 1995) and the Priroda module (launched in 1996), making them de facto U.S. modules during the duration of the Shuttle-Mir program.

Connections

Categories